Project reference · Complete refurbishment
Hydropower Plant Solberg
Refurbishment of the turbine, generator, waterway, trash rack, hydraulics and control technology in an existing hydropower plant.
TurbineFrancis turbine
GeneratorAsynchronous generator · 40 kW
Head4.5 m
Flow rate1,000 l/s
Project scopeComplete refurbishment
Turbine, waterway and automation
Renewal of the plant’s core components
As part of a complete refurbishment, the Francis turbine was overhauled and the generator replaced. A new trash-rack field was constructed on the water side, and the leaking wooden pipeline was replaced with a GRP pipeline.
The control system was rebuilt from the ground up. The scope includes a Siemens S7-1500 PLC, reactive-power compensation, a new hydraulic power unit, and temperature and vibration sensors. Automatic setpoint level control supports regulated operation.
- Machinery: Overhaul of the Francis turbine and replacement of the asynchronous generator.
- Waterway: Wooden pipeline replaced by a GRP pipeline; new trash-rack field constructed.
- Control system: Complete new build with Siemens S7-1500, temperature and vibration monitoring.
- Hydraulics and control: New hydraulic power unit, reactive-power compensation and automatic setpoint level control.

Overhaul of the Francis turbine in the machine area.

Machine area during renewal.

Water and machinery area of the plant.

Existing waterway before renewal.

Work on the renewed waterway.

Newly constructed GRP waterway.

Overall view of the new pipeline route.

Fine trash rack protecting the turbine intake.

Existing control and display unit before renewal.