Project reference · Complete refurbishment

Hydropower Plant Solberg

Refurbishment of the turbine, generator, waterway, trash rack, hydraulics and control technology in an existing hydropower plant.

TurbineFrancis turbine
GeneratorAsynchronous generator · 40 kW
Head4.5 m
Flow rate1,000 l/s
Project scopeComplete refurbishment
Turbine, waterway and automation

Renewal of the plant’s core components

As part of a complete refurbishment, the Francis turbine was overhauled and the generator replaced. A new trash-rack field was constructed on the water side, and the leaking wooden pipeline was replaced with a GRP pipeline.

The control system was rebuilt from the ground up. The scope includes a Siemens S7-1500 PLC, reactive-power compensation, a new hydraulic power unit, and temperature and vibration sensors. Automatic setpoint level control supports regulated operation.

  • Machinery: Overhaul of the Francis turbine and replacement of the asynchronous generator.
  • Waterway: Wooden pipeline replaced by a GRP pipeline; new trash-rack field constructed.
  • Control system: Complete new build with Siemens S7-1500, temperature and vibration monitoring.
  • Hydraulics and control: New hydraulic power unit, reactive-power compensation and automatic setpoint level control.