Project reference · Sweden

Hydropower Plant Rävmarken

Complete modernization of control and hydraulics, with automatic water-level and electricity-price control for yield-optimized operation.

Head35 m
Flow rate1,200 l/s
Output320 kW
TurbineFrancis
GeneratorAsynchronous
Plant control, hydraulics and yield optimization

Fully automated operation from a large reservoir

Hydropower Plant Rävmarken in Sweden operates at 35 m head, 1,200 l/s flow and 320 kW output. Its machinery consists of a Francis turbine with an asynchronous generator.

The project covered the complete plant control system, including a new control cabinet and hydraulic power unit. Reactive-power compensation was added, and the control system was extended with automatic water-level control.

A central element of the modernization is fully automatic electricity-price control: generation from the large reservoir is scheduled for periods with particularly high market prices.

Rävmarken therefore combines robust machinery with automated operation, controlled water levels and a market-price-oriented generation strategy.

  • Control system: Complete plant control system with a new control cabinet.
  • Hydraulics: New hydraulic power unit for plant functions.
  • Grid technology: Reactive-power compensation added.
  • Optimization: Automatic water-level and electricity-price control.

← Back to all projects